Power Distribution

XL Power Distribution Cabinets

Custom low-voltage cabinets for incoming and outgoing power distribution, with circuit protection, metering and enclosure arrangements defined for your project.

Have drawings? Send them for technical review. No final drawings yet? Start with your loads, circuits, and required functions.

Open GoodQi XL power distribution cabinet showing the internal component and wiring arrangement

Application Scope

Typical Applications

Typical uses include distributing power to workshop equipment, supplying grouped loads in industrial facilities, and incoming or outgoing distribution for building services.

Choose the cabinet arrangement from the load schedule, circuit requirements and installation conditions. These examples describe uses, not completed customer projects.

Start With What You Have

Choose the starting point that matches your project stage.

Have Drawings or Specifications?

01

Send the available project information for review, such as:

  • Single-line diagrams
  • Electrical drawings
  • Load schedules
  • Project specifications
  • Component requirements
  • Existing cabinet requirements
Send Your Documents

Need Help Defining the Cabinet?

02

If the final cabinet design has not yet been completed, start with:

  • Supply conditions
  • Loads and circuits
  • Required functions
  • Component preferences
  • Installation conditions
  • Space or layout constraints

Within the agreed cabinet project scope, GoodQi can develop the cabinet single-line arrangement, component selection, and cabinet design for customer review and approval.

Start From Requirements

Engineering support applies to the agreed cabinet scope. Broader electrical-system design responsibilities are reviewed separately when applicable.

Technical Information

Project Information to Confirm

Use this checklist to prepare the technical review. These are project inputs, not fixed product ratings; the final configuration is agreed before production.

01

Supply, Current & Short-Circuit Data

Supply voltage and frequency, required current, earthing system and available short-circuit data.

02

Incoming & Outgoing Circuits

Incoming supply arrangement, outgoing circuit quantities, load schedule and any spare-circuit requirements.

03

Protection, Metering & Indication

Required protective devices, metering, status indication and operating functions.

04

Component Selection

Preferred brands and models, component list or BOM, and any restrictions on substitutions.

05

Cabinet Configuration

Available dimensions, mounting arrangement, cable entry and exit, busbar requirements and access space.

06

Installation Environment

Indoor or outdoor location, ambient conditions, dust or moisture exposure, and required enclosure protection.

07

Testing Requirements

Required inspection and tests, acceptance criteria, and any FAT or witness-testing requests.

08

Project Documentation

Destination requirements, applicable standards, drawing revisions, approval responsibilities and required reports.

Engineering Support

From Project Requirements to an Approved Cabinet Configuration

  1. 01

    Review Project Inputs

    We review the drawings, specifications, load information, or functional requirements currently available.

  2. 02

    Clarify Open Points

    Technical questions, assumptions, missing information, and project-specific requirements are identified before the scope is finalized.

  3. 03

    Develop the Cabinet Configuration

    Where required, GoodQi develops the cabinet single-line arrangement, component selection, and cabinet design within the agreed project scope.

  4. 04

    Customer Review & Approval

    The proposed configuration and relevant drawings or specifications are submitted for customer review and confirmation.

  5. 05

    Freeze Before Production

    The approved configuration and current revision are confirmed before production release. Subsequent changes are reviewed before implementation.

Component Options

Component Selection Around Project Requirements

Component brands and models can be reviewed according to customer preferences, technical requirements, compatibility, and supply availability.

Final component selection is confirmed as part of the project technical scope before production.

Customer Preference
Technical Compatibility
Supply Availability
Confirmed Project Selection

Quality & Verification

Inspection & Testing Before Release

Inspection and testing are carried out against the agreed project configuration and requirements.

01

Incoming Inspection

Incoming components and materials are checked as part of the production process.

02

Assembly & Wiring Inspection

Assembly, wiring, and relevant production details are checked during manufacturing.

03

Final Inspection & Functional Checks

Final inspection and agreed functional checks are completed before release.

If a project requires specific FAT procedures, witness testing, third-party involvement, acceptance criteria, or report formats, these requirements must be identified and confirmed before order commitment.

Project Input

Start Your Project Review

Include the project details below with your technical checklist and any supporting files.

Useful Project Information

  • Project country or delivery destination
  • Supply voltage and frequency
  • Load and circuit information
  • Required functions
  • Incoming and outgoing requirements
  • Component preferences
  • Installation environment
  • Space or layout constraints
  • Quantity
  • Testing and documentation requirements

Files You Can Send

If available:

  • Single-line diagram
  • Electrical drawings
  • Load schedule
  • Project specification
  • Existing component list or BOM
  • Relevant technical documents

The RFQ form prepares an email draft. Attach your files in your email app before sending.

Send Project Requirements

Real Product Context

Actual Cabinet & Manufacturing Context

The images below show actual cabinet and manufacturing context. They are not presented as completed overseas customer references.

Open GoodQi XL power distribution cabinet showing its internal arrangement
Open XL cabinet showing actual internal component, assembly, and wiring context.
GoodQi XL cabinet photographed in the workshop
The same cabinet in an actual GoodQi workshop environment.

XL Project FAQ

How do I send drawings with my enquiry?

Use the RFQ form to prepare an email draft, then attach the drawings in your email app. You can also copy the inquiry details into your preferred email service and add the files there.

Can GoodQi help develop the cabinet configuration?

Yes. Within the agreed cabinet project scope, GoodQi can develop the cabinet single-line arrangement, component selection, and cabinet design for customer review and approval.

Can I request a specific cabinet layout?

Share the available space, mounting arrangement, cable entry and exit, and access requirements so they can be reviewed during cabinet configuration.

Can I specify preferred component brands or models?

Yes. Customer preferences can be reviewed against technical compatibility, project requirements, and supply availability before the final component selection is confirmed.

How are testing and conformity requirements handled?

Project-specific testing, documentation, and applicable conformity requirements should be identified as early as possible. Their applicability and executability are reviewed before order confirmation.

Have an XL Distribution Project to Review?

Include the quantity, destination and available technical documents so we can review your XL enquiry.