Engineering & Quality Control for Electrical Cabinets

From project requirements to a confirmed cabinet configuration, controlled assembly, inspection and testing, agreed documentation and release.

Project Confirmation

Confirm the Cabinet Before Production

Technical requirements, open points and responsibilities are reviewed before the cabinet configuration proceeds to production.

  1. Customer inputs
  2. Engineering review
  3. Proposed cabinet configuration
  4. Customer approval, where applicable
  5. Confirmed configuration released to production
Start a Project Review
GoodQi cabinet in a workshop environment

Cabinet-Level Engineering

GoodQi engineering scope focuses on the cabinet and its agreed interfaces: circuit arrangement, component selection, cabinet layout, wiring and project drawings.

Broader system design, PLC/HMI programming, site installation and commissioning are not included by default. Any required work must be agreed separately.

Customer-Provided Information

  • Existing drawings and load / circuit information
  • Component preferences and installation environment
  • Control / interface requirements and inspection / documentation needs

Incomplete information is enough to start a discussion; final drawings are not required.

Component Selection

Options may include Schneider, ABB, Siemens, CHINT and DELIXI, subject to technical compatibility and availability. Brands and models are confirmed for the project.

Brand options do not imply authorization, partnership or distributor status.

Quality Control Through to Release

  1. IQC — Incoming Checks

    Components and cabinet materials are checked against confirmed project requirements before assembly.

  2. Assembly / IPQC

    Installation, wiring, identification and the confirmed configuration are checked during assembly.

  3. Final Inspection & Testing

    Final inspection, energization checks and agreed functional / testing items are completed before release.

  4. Records

    Inspection and test records are provided according to the agreed project documentation scope.

Project-Specific Inspection & Testing

Test items, acceptance requirements and records are confirmed for the cabinet and project. The list below is not a fixed test package for every product.

Insulation Testing
Performed according to agreed project requirements.
Protective Earthing / Grounding Continuity Check
Checks protective earthing connections and continuity within the cabinet. This does not cover site earth resistance, grounding electrodes or a complete site earthing system.
Energization Check
Power-on checks within the agreed cabinet scope; not full-load testing, site energization or system commissioning.
Functional Testing
Checks against the approved configuration, drawings and agreed functions. PLC/HMI or external interface simulation is included only when specifically agreed.
Withstand-Voltage Testing
Withstand-voltage testing can be performed when specified and agreed for the project.

Agreed Project Documentation

Depending on the agreed project scope, documentation may include:

  • Approved cabinet / GA drawings
  • SLD or cabinet-level circuit drawings
  • Device schedule
  • Wiring diagrams
  • Inspection / test records
  • Project-specific technical documentation

The deliverable list is agreed for each project; full-system SLD and complete system design are not default deliverables.

Inspection Arrangements

Third-party inspection or witnessed testing can be arranged when agreed before order.

FAT procedures, witness requirements, acceptance criteria and report formats must be agreed for the project; FAT is not included by default.

CQC Applicability

CQC certification information may be available for applicable products/configurations. The applicable scope should be confirmed for the specific product and project.

Start With Your Available Project Information

Share existing drawings, project requirements and inspection / documentation needs. Complete final drawings are not required to start.